Our market

Park & Charge charging pole for single-phase charging (Slow charging, Mode 1). The pole is prepared for 3-phase charging (Semi-fast charging, Mode 3)

ABB's charging pole integrated with Park & Charge access system. The pole is developed for single-phase charging (Mode 1) but also prepared for 3-phase charging (Mode 3)

Park & Charge's quick charging offer (Mode 4) with CHAdeMO interface
EU:s energy mix for electricity production, makes electrical and hybrid vehicles an important part in the strategy of decreasing carbon dioxide emission.
To be able to reach the goal of a non-carbon dioxide based transport system by the year 2050, EU must prioritize the change to a stable and energy efficient transport system.
From a global perspective, climate changes, emission of carbon dioxide and other pollutants, and the unstable oil prices, have made the technical development of batteries and energy storage systems progress. The awareness of these issues has also increased in the global market.
This has created a positive environment for global development of electrical and hybrid vehicles.
This has created a positive environment for global development of electrical and hybrid vehicles.
Park & Charge offers a total functional solution for all types of charging places for hybrid and electrical vehicles. Our solution is based on the idea to use existing infrastructure and open standards as much as possible.
Our offer includes the following:
- Infrastructure for power supply to car park charging places
- Charging poles, Park & Charge's pole for slow charging and also ABB's charging pole integrated with our access system, P&C SAS.
- Ouick charger with CHAdeMO interface
- Access solutions to charging poles and integration of payment systems
- Equipment for consumption metering and collection of consumption data
- Support and field service
Join Park & Charge on facebook Here you can find photos of our installations, client descriptions, invitations to events etc
Park & Charge's quick charging setup (Mode 4, CHAdeMO) at Arlanda airport

Newsletter
Follow the development of a greener future!


